Employer's information requirements (EIR)
Create your BIM requirements (EIR) based on your needs and specific project
OUR SERVICES

BIM Project Management
Full scope BIM services implementation on your project. Defining project BIM requirements, setting up space for BIM workflow, BIM execution plan development and execution, BIM model quality assurance and control. Overall - achieving Clients set Project BIM goals.

BIM Coordination
All about model quality control and assurance. BIM execution plan execution, model clash management and control, model development progress tracking, LOD and LOI status control.

BIM Consultancy
Everything about BIM knowledge and usage on a daily basis. Periodic coaching of your team during the project, BIM project management and BIM management tools training.

BIM implementation strategy and BIM Requirements (tender)
Develop a BIM implementation strategy in your company and use BIM in your processes: Enterprise audit, external analysis, internal analysis, strategic alternatives development, recommendation and strategy formulation, implementation, process maintenance. BIM objectives and applications, employer information requirements (EIR), model scope description, quality requirements, and means of verification.

InfraBIM Project Management
Full scope BIM management services with a focus on InfraBIM projects. Monitoring the development trends of InfraBIM standards in the global market and implementing the available standards and technical solutions.

BIM Expertise
You are not sure regarding model quality? BIM model clash detection and quality check with rule-based checks, LOD and LOI validation, BIM management documentation (EIR, BEP etc.) execution overview, comprehensive BIM expertise report.

4D BIM
Adding scheduling information to model construction sequences and processes to manage construction statuses.

5D BIM
Adding budgetary and cost information to a model.

6D BIM
Adding facility management to the information set.
TEAM
OUR PROJECTS
- All
- Buildings (BIM Projects)
- Infrastructure (InfraBIM Projects)

Public canteen

Public canteen
Type: Public building
Location: Vilnius, Lithuania
Size: 750 m²
Detailed Employer’s Information Requirements (EIR) were created, based on which a detailed project implementation plan (BEP) was prepared. It was planned to use the model in the design and construction phases of the project. At the end of the project, the As-Built BIM model was delivered – the geometric detail of the elements was ensured, the model was completed with relevant parametric information and linked to the entire project documentation.

Research Center of Vilnius University Faculty of Medicine

Research Center of Vilnius University Faculty of Medicine
Type: Educational building
Location: Vilnius, Lithuania
Size: 19000 m²
The main goal is high quality of digital information models and mutual compatibility of different parts of the project. Since the project includes a large number of engineering systems, it is particularly important to evaluate their position and compatibility with other parts of the project.
Additional use of BIM – the creation of a 4D work schedule using digital information. In this case, great attention is paid to the parametric information of the elements and their correctness.

DHL Logistics Terminal

DHL Logistics Terminal
Type: Multifunctional building
Location: Vilnius, Lithuania
Size: 16 800 m²
The main goal is high quality of digital information models and mutual compatibility of different parts of the project. Since the project includes a large number of engineering systems, it is particularly important to evaluate their position and compatibility with other parts of the project.
Additional use of BIM – the creation of a 4D work schedule using digital information. In this case, great attention is paid to the parametric information of the elements and their correctness.

Pedestrian Bridge over the Neris River

Pedestrian Bridge over the Neris River
Type: Infrastructure
Location: Vilnius, Lithuania
Size: 150 m
The objective of this project is to provide consultations, develop BEP (BIM Execution Plan) for successful project execution and provide BrIM coordination services during construction and handover (maintenance) phase.

Visual Programming Algorithm for the 3D Geometry of a Viaduct

Visual Programming Algorithm for the 3D Geometry of a Viaduct
Type: Infrastructure
Location: Latvia
Size: 1 km
The objective for this project is to develop a visual programming algorithm for the 3D geometry of a viaduct.

Rail Baltica Main Line Vangaži – Salaspils – Misa

Rail Baltica Main Line Vangaži – Salaspils – Misa
Type: Infrastructure (Rail Baltica)
Location: Latvia
Size: 26km
The objective of this project was to provide consultations, develop BEP (BIM Execution Plan) for successful project execution and provide InfraBIM coordination services during construction and handover (maintenance) phase.

Construction project of 330 kW single-circuit over-ground line

Construction project of 330 kW single-circuit over-ground line
Type: High voltage electric line
Location: Jurbarko distr.-Šakiai distr.-Vilkaviškis distr., Lithuania
Size: 62 km
The goal of the client is to create a digital information model both for the visual evaluation of project solutions and for the formation of parametric information (quantity analysis, use of information during operation period ).

Rail Baltica Riga International airport railway station

Rail Baltica Riga International airport railway station
Type: high-speed railway and airline connection center (station building, flyovers, rail roads, bridges, viaducts, connected roads).
Location: Riga, Latvia
Size: 15000 sq. m.
The objective for this project is to provide InfraBIM management services during construction and handover (maintenance) phase.

Lithuanian Academy of Music and Theatre

Lithuanian Academy of Music and Theatre
Type: Campus building
Location: Vilnius, Lithuania
Size: 29 000 sq. m.
As this is one of the largest new educational campuses, the focus is on ensuring the geometric quality of the project.
To ensure an efficient process, the project team and client were introduced to the basic rules and procedures for the successful implementation of the digital project (BEP document).

Hotel reconstruction project

Hotel reconstruction project
Type: Residential building
Location: Vilnius (Šv.Stepono st. 33, 35A), Lithuania
Based on clear project implementation requirements (EIR document) provided by the client, a detailed BIM project implementation plan (BEP document) was prepared.
In the development of the digital information model(s), the main focus was on the use of the information in the next phases of project implementation (preparation of the work project and construction).

Residential building complex

Residential building complex
Type: Residential building
Location: Vilnius (Skroblų g.12/14), Lithuania
Size: 10 000 sq. m.
Based on clear project implementation requirements (EIR document) provided by the client, a detailed BIM project implementation plan (BEP document) was prepared.
As the BIM model is used for quantity takeoff, the main focus is on project quality and geometric accuracy.

Shopping Mall “Vilnius Outlet”

Shopping Mall “Vilnius Outlet”
Type: Retail building
Location: Vilnius, Lithuania
Size: 62 000 sq. m.
At the request of the builder, the focus was on the execution of BIM coordination processes performing BIM model quality check, taking into account the purpose and scope of the project (bulky ventilation elements, fire extinguishing system requirements, a large number of metal structures).
Complex design changes and solutions were made based on both technological nuances and the client’s needs.

Hotel “MOXY Kaunas”

Hotel “MOXY Kaunas”
Type: Hotel
Location: Kaunas, Lithuania
Size: 6 800 sq. m.
The implementation of the project focused on the creation of information for the operation and asset management of the building.
The created as-built model provides not only parametric element information, but also with easily accessible constructive execution documentation, 2D documents, technical documentation, drawings, plans, warranties, user manuals, specifications.
Baltic BIB Management was also involved in the design phase to ensure the quality of the models and provided BIM management and coordination services.

Multifunctional Building “Merkurijus”

Multifunctional Building “Merkurijus”
Type: Multifunctional building
Location: Kaunas (Laisvės Av. 60), Lithuania
Size: 41 000 sq. m.
The goal of the project is to have effective and smooth communication with the all project participants and a highest quality, coordinated BIM model for successful BIM Project execution. As this was a pilot project (in terms of digital project development) for some project participants, much emphasis was placed on ensuring standardised BIM process.

Latvian Museum of Contemporary Art

Latvian Museum of Contemporary Art
Type: Public building
Location: Riga, Latvia
Size: 8 670 sq. m.
The main objective of the project was to overtake BIM Management to help the stakeholders execute BIM project. BIM Management plan (BEP) was developed in synergy with the project management plan, thus improving project management process by adding BIM aspects thus improving quality control, communication, information exchange, clarifying responsibilities and streamlining BIM development process.

Science Park (part of “RIX High Tech City”)

Science Park (part of “RIX High Tech City”)
Type: Science and business centre building
Location: Riga, Latvia
Size: 26 140 sq. m.
The objective of this project was to develop BIM processes and develop BEP( BIM Execution Plan) successful BIM Project execution and execute BEP aspects throughout BIM Coordination processes performing BIM model quality checks, manage information exchange, setting up and managing CDE (Common Data Environment), managing information quality and other activities necessary for BIM project execution.

Business Center “Elemental”

Business Center “Elemental”
Type: Office Building
Location: Riga, Latvia
Size: 55 000 sq. m.
The objective of this project was to coordinate building structural model with other models, such as architecture, ventilation, heating and other MEP disciplines; develop processes and workflows supporting coordination process and advise building owner about BIM related questions and performing independent (from oppointed BIM Manager) model quality checks.

Building complex “Preses Nams”

Building complex “Preses Nams”
Type: Office, Hotel and Multifunctional building
Location: Riga, Latvia
Size: 110 000 sq. m.
The objective for this project was to oversee BIM management process by developing overall BEP (Building Execution Plan) document as a framework for each building BIM managers and evaluate submitted post-contract Execution documents; perform quality checks (both technical and process related) to make sure BEP document is executed according to plan; consult project stakeholders; assess BIM project statuses and advice building owner on different BIM uses.

Office Building “Marijas street 2A”

Office Building “Marijas street 2A”
Type: Office Building
Location: Riga, Latvia
Size: 32 000 sq. m.
The objective of this project was to manage and coordinate BIM project development by developing BEP (Building Execution Plan) document and perform BIM Coordination. Great emphasis in this project was put on design related quality checks, helping the design team to deliver high quality project.

Office Building Reconstruction

Office Building Reconstruction
Type: Office Building reconstruction
Location: Riga (Katlakalna 11E), Latvia
Size: 3 600 sq. m.
The objective was to help design team develop high quality BIM project by improving Pre-Contract BEP (Building Execution Plan) and provide BIM Coordination by putting emphasis on BIM uses beyond design phase, such as usage of BIM model in cost estimation, construction management, tennant planning, maintenance and building operational management.

Multifunctional building “Akropole”

Multifunctional building “Akropole”
Location: Riga, Latvia
Size: 107 000 sq. m.
The objective for this project was to oversee BIM management process by developing overall project BIM strategy, BEP (Building Execution Plan) document and setting up a BIM workflow as a framework for whole retail complex; perform quality checks (both technical and process related) to make sure BEP document is executed according to plan; consult project stakeholders and advice building owner on different BIM uses.

Multifunctional car parking lot

Multifunctional car parking lot
Type: Transport purpose building
Location: Vilnius, Lithuania
Size: 25 000 sq. m.
Main goal for this project was to introduce the Client to BIM uses and benefits of BIM technologies by showing the BIM workflow and highlighting the problems resolved in the early phases of the project. Great emphasis in this project was put on design related multidisciplinary quality checks, helping the design team deliver high quality project.

Vilnius City Court Complex

Vilnius City Court Complex
Type: Administrative building
Location: Vilnius, Lithuania
Size: 23 000 sq. m.
The complexity of architectural representation and structural solutions obliged Client to strive for the highest quality project.The objective of this project was to develop BEP( BIM Execution Plan) for successful BIM Project execution and execute BEP aspects throughout BIM Coordination processes performing BIM model quality checks, manage information exchange, managing information quality and other activities necessary for BIM project execution.

Commercial building “Business Garden Vilnius”

Commercial building “Business Garden Vilnius”
Type: Office building
Location: Vilnius, Lithuania
Size: 65 000 sq. m.
The objective of this project was to develop BIM strategy for design and construction phases, putting the main focus on precast concrete elements modeling; develop BEP (BIM Execution Plan) for successful BIM Project execution and assure model quality by performing constant BIM model quality checks; manage information exchange, managing information quality and other activities necessary for BIM project execution.

Office complex VERDE

Office complex VERDE
Type: Office building
Location: Riga (Hirsa 1), Latvia
Size: 61400 sq. m.
The objective of this project was to develop BIM strategy for design, construction and operation phases; develop BEP (BIM Execution Plan) for successful BIM Project execution and execute BIM Coordination processes performing BIM model quality checks, manage information exchange, setting up and managing CDE (Common Data Environment), managing information quality and other activities necessary for BIM project execution.