- All
- Buildings (BIM Projects)
- Infrastructure (InfraBIM Projects)

Smiltynė Ferry Terminal

Smiltynė Ferry Terminal
Type: Infrastructure/ Administrative
Location: Klaipėda, Lithuania
Size: 15 000,00 m3
The objective:
– BIM Expertise and digital project evaluation.

Kindergarden Aušrinės g. 10A

Kindergarden Aušrinės g. 10A
Type: Public building
Location: Vilnius, Lithuania
Size: 750 m²
The objectives:
– develop BEP (BIM Execution Plan) with basic rules and procedures for for successful BIM Project execution;
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution.

Public canteen

Public canteen
Type: Public building
Location: Vilnius, Lithuania
Size: 750 m²
The objectives:
– create detailed Employer’s Information Requirements (EIR);
– develop BEP (BIM Execution Plan) with basic rules and procedures for for successful BIM Project execution;
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution;
– create and deliver as-built model with the relevant parametric information and all the project documentation (2D documents, technical documentation, drawings, plans, warranties, user manuals, specifications).

Research Center of Vilnius University Faculty of Medicine

Research Center of Vilnius University Faculty of Medicine
Type: Educational building
Location: Vilnius, Lithuania
Size: 19000 m²
The objectives:
– BIM Consultancy
– BIM Expertise

DHL Logistics Terminal

DHL Logistics Terminal
Type: Multifunctional building
Location: Vilnius, Lithuania
Size: 16 800 m²
The objectives:
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution;
– develop 4D BIM schedule-related information and processes to create a virtual construction sequence and manage construction statuses.

Pedestrian Bridge over the Neris River

Pedestrian Bridge over the Neris River
Type: Infrastructure
Location: Vilnius, Lithuania
Size: 150 m
The objectives:
– develop BEP (BIM Execution Plan) with basic rules and procedures for for successful BIM Project execution;
– execute BEP and coordinate BrIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution;

Visual Programming Algorithm for the 3D Geometry of a Viaduct

Visual Programming Algorithm for the 3D Geometry of a Viaduct
Type: Infrastructure
Location: Latvia
Size: 1 km
The objective for this project is to develop a visual programming algorithm for the 3D geometry of a viaduct.

Rail Baltica Main Line Vangaži – Salaspils – Misa

Rail Baltica Main Line Vangaži – Salaspils – Misa
Type: Infrastructure (Rail Baltica)
Location: Latvia
Size: 26km
The objectives:
– develop BEP (BIM Execution Plan) with basic rules and procedures for for successful BIM Project execution;
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution;

Construction project of 330 kW single-circuit over-ground line

Construction project of 330 kW single-circuit over-ground line
Type: High voltage electric line
Location: Jurbarko distr.-Šakiai distr.-Vilkaviškis distr., Lithuania
Size: 62 km
The objectives:
– develop BEP (BIM Execution Plan) with basic rules and procedures for for successful InfraBIM Project execution;
– execute BEP and coordinate InfraBIM process:
performing BIM model quality checks;
managing information exchange;
managing CDE (Common Data Environment);
managing information quality;
other activities necessary for BIM project execution;
– create and deliver as-built model with the relevant parametric information and all the project documentation (2D documents, technical documentation, drawings, plans, warranties, user manuals, specifications).

Rail Baltica Riga International airport railway station

Rail Baltica Riga International airport railway station
Type: high-speed railway and airline connection center (station building, flyovers, rail roads, bridges, viaducts, connected roads).
Location: Riga, Latvia
Size: 15000 sq. m.
The objectives:
– develop BEP (BIM Execution Plan) with basic rules and procedures for for successful InfraBIM Project execution;
– execute BEP and coordinate InfraBIM process:
performing BIM model quality checks;
managing information exchange;
managing CDE (Common Data Environment);
managing information quality;
other activities necessary for BIM project execution;
– Develop 4D InfraBIM schedule-related information and processes to create a virtual construction sequence and manage construction statuses.

Lithuanian Academy of Music and Theatre

Lithuanian Academy of Music and Theatre
Type: Campus building
Location: Vilnius, Lithuania
Size: 29 000 sq. m.
The objectives:
– develop BEP (BIM Execution Plan) with basic rules and procedures for for successful BIM Project execution;
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution;

Hotel reconstruction project

Hotel reconstruction project
Type: Residential building
Location: Vilnius (Šv.Stepono st. 33, 35A), Lithuania
The objectives:
– develop BEP (BIM Execution Plan) with basic rules and procedures for for successful BIM Project execution;
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution;

Residential building complex

Residential building complex
Type: Residential building
Location: Vilnius (Skroblų g.12/14), Lithuania
Size: 10 000 sq. m.
The objectives:
– develop BEP (BIM Execution Plan) with basic rules and procedures for for successful BIM Project execution;
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution;

Shopping Mall “Vilnius Outlet”

Shopping Mall “Vilnius Outlet”
Type: Retail building
Location: Vilnius, Lithuania
Size: 62 000 sq. m.
The objectives:
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks, taking into account the purpose and scope of the project (bulky ventilation elements, fire extinguishing system requirements, a large number of metal structures).
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution;

Hotel “MOXY Kaunas”

Hotel “MOXY Kaunas”
Type: Hotel
Location: Kaunas, Lithuania
Size: 6 800 sq. m.
The objectives:
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution;
– create and deliver as-built model with the relevant parametric information and all the project documentation (2D documents, technical documentation, drawings, plans, warranties, user manuals, specifications).

Multifunctional Building “Merkurijus”

Multifunctional Building “Merkurijus”
Type: Multifunctional building
Location: Kaunas (Laisvės Av. 60), Lithuania
Size: 41 000 sq. m.
The objectives:
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution;

Latvian Museum of Contemporary Art

Latvian Museum of Contemporary Art
Type: Public building
Location: Riga, Latvia
Size: 8 670 sq. m.
The objectives:
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution;

Science Park (part of “RIX High Tech City”)

Science Park (part of “RIX High Tech City”)
Type: Science and business centre building
Location: Riga, Latvia
Size: 26 140 sq. m.
The objectives:
– develop BEP (BIM Execution Plan) with basic rules and procedures for for successful BIM Project execution;
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution;

Business Center “Elemental”

Business Center “Elemental”
Type: Office Building
Location: Riga, Latvia
Size: 55 000 sq. m.
The objectives:
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution;

Building complex “Preses Nams”

Building complex “Preses Nams”
Type: Office, Hotel and Multifunctional building
Location: Riga, Latvia
Size: 110 000 sq. m.
The objectives:
– develop BEP (BIM Execution Plan) with basic rules and procedures for for successful BIM Project execution;
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution;

Office Building “Marijas street 2A”

Office Building “Marijas street 2A”
Type: Office Building
Location: Riga, Latvia
Size: 32 000 sq. m.
The objectives:
– develop BEP (BIM Execution Plan) with basic rules and procedures for for successful BIM Project execution;
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution;

Office Building Reconstruction

Office Building Reconstruction
Type: Office Building reconstruction
Location: Riga (Katlakalna 11E), Latvia
Size: 3 600 sq. m.
The objectives:
– develop BEP (BIM Execution Plan) with basic rules and procedures for for successful BIM Project execution;
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔putting emphasis on BIM uses beyond design phase (cost estimation, construction management, tennant planning, maintenance and building operational management);
✔other activities necessary for BIM project execution;

Multifunctional building “Akropole”

Multifunctional building “Akropole”
Location: Riga, Latvia
Size: 107 000 sq. m.
The objectives:
– develop BIM strategy for design, construction and operation phases;
– develop BEP (BIM Execution Plan) with basic rules and procedures for for successful BIM Project execution;
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution.

Multifunctional car parking lot

Multifunctional car parking lot
Type: Transport purpose building
Location: Vilnius, Lithuania
Size: 25 000 sq. m.
The objectives:
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution.

Vilnius City Court Complex

Vilnius City Court Complex
Type: Administrative building
Location: Vilnius, Lithuania
Size: 23 000 sq. m.
The objectives:
– develop BEP (BIM Execution Plan) with basic rules and procedures for for successful BIM Project execution;
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution.

Commercial building “Business Garden Vilnius”

Commercial building “Business Garden Vilnius”
Type: Office building
Location: Vilnius, Lithuania
Size: 65 000 sq. m.
The objectives:
– develop BIM strategy for design, construction and operation phases, putting the main focus on precast concrete elements modeling;
– develop BEP (BIM Execution Plan) with basic rules and procedures for for successful BIM Project execution;
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution.

Residential apartment building

Residential apartment building
Type: Residential building
Location: Vilnius (Olandų st.), Lithuania
Size: 6 000 sq. m.
The objectives:
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution.

Office complex VERDE

Office complex VERDE
Type: Office building
Location: Riga (Hirsa 1), Latvia
Size: 61400 sq. m.
The objectives:
– develop BIM strategy for design, construction and operation phases;
– develop 4D BIM sequencing and processes to manage construction statuses.
– develop BEP (BIM Execution Plan) with basic rules and procedures for for successful BIM Project execution and ensure customer receive building digital twin;
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution;

Residential apartment building

Residential apartment building
Type: Residential building (social housing)
Location: Vilnius, Lithuania
Size: 4 000 sq. m.
The objectives:
– collaborate with the design team in order to achieve high quality BIM project on the bases of Pre-Contract EIR (Employers Information Requirements);
– develop BEP (BIM Execution Plan) with basic rules and procedures for for successful BIM Project execution;
– execute BEP and coordinate BIM process:
✔performing BIM model quality checks;
✔managing information exchange;
✔managing CDE (Common Data Environment);
✔managing information quality;
✔other activities necessary for BIM project execution.